Environmental quality assessment provides high-quality results

ECOSMARTLAB

Mobile environmental laboratory

Visits of the team of experts to Ukrainian enterprises to carry out measurements in accordance with the permits

Measurements

Conducting studies for post-project monitoring December 2025

Measurement of air pollutants and noise levels at the boundary of the sanitary protection zone. Conducting operational monitoring of mobile emission sources.

Measurements

Conducting studies for post-project monitoring November 2025

Measurement of air pollutants and noise levels at the boundary of the sanitary protection zone. Conducting operational monitoring of mobile emission sources.

Measurements

Implementation of operational monitoring of mobile emission sources November 2025

Conducting studies for post-project monitoring, specifically: measuring pollutants and noise levels in the ambient air at the boundary of the sanitary protection zone

Measurements

Conducting production control October 2025

Processing and storage of bituminous coal. Production of coal briquettes. Conducting production monitoring at stationary sources of pollutant emissions

Measurements

Site visit to the company August 2025

Measurement of atmospheric air quality parameters in the enterprise's sanitary protection zone

Measurements

Measurement of pollutants September 2025

at stationary sources of air pollutant emissions for the purpose of obtaining an emissions permit.

Measurements

Post-project monitoring August 2025

Based on the Monitoring Program—measurements of pollutant levels at stationary sources of atmospheric emissions

Measurements

Visit to the site of an enterprise producing various coal fractions April 2024

Visit to the site of the enterprise producing different coal fractions to carry out post-project monitoring, including measurements of air pollutants and determination of noise parameters in the SPZ

Measurements

Travelling to the company that subleases premises April 2024

A visit to an enterprise that leases premises (a shopping centre) in order to carry out industrial control of stationary sources of air emissions (diesel generators) in accordance with the terms of the emission permit.

Measurements

Visit to the port operator's facility March 2024

We move to the control points in the SPZ to measure air pollutants generated by the port operator's activities

Measurements

Visit to the site of a heat generation enterprise December

A visit to the site of a heat production facility to carry out industrial control of stationary sources of air emissions and to draw up a GHG passport and check the efficiency of the plant.

Measurements

Visit to the port operator's site November

Visit to the site of the port operator in the Southern region to carry out Post Project Air Monitoring

Measurements

Visit to the port operator's site November

Visit to the site of the port operator in Odesa region to carry out PMS, in particular, measurements on: mobile emission sources (smoke from diesel combustion and toxicity from petrol), SPZ of pollutants (suspended solids, nitrogen dioxide, carbon monoxide, sulphur dioxide) in the air and acoustic impact.

Measurements

Visit to the port operator's site October 2023

for the purpose of production control (measurements at stationary sources), in accordance with the requirements of Article 11 of the Law of Ukraine "On Atmospheric Air Protection"

Measurements

Visit to an agricultural enterprise (cultivation and preparation of agricultural products) September 2023

industrial control of stationary sources of air emissions and preparation of the GHG passport and verification of the plant's efficiency

Measurements

Visit to the port operator September 2023

Implementation of post-project monitoring (PPM).Sampling from the water body and determining the impact of the enterprise's activities on the water environment.

Measurements

Visiting an agricultural enterprise (growing and preparing agricultural products) August 2023

industrial control of stationary sources of air emissions and preparation of the GHG passport and verification of the plant's efficiency

Measurements

Site visit (production of freeze-dried products) August 2023

Implementation of industrial control of stationary sources of air emissions

Measurements

Visit to the enterprise (production of refrigerators) August 2023

Implementation of industrial control of stationary sources of air emissions

Measurements

Visit to an enterprise (agricultural producer) in Odesa region August 2023

conducting a review inventory of air emission sources to obtain an emission permit.

Measurements

Visit to a utility company August 2023

sampling at biological treatment facilities of a municipal enterprise

Measurements

Field trip to one of the quarries in Ukraine July 2023

Measures of the impact of the enterprises' activities on the surface water body downstream and upstream of the wastewater discharge point

Measurements

Field trip to one of the quarries in Ukraine July 2023

Conducting vibration, noise, and air quality measurements by Ecosmartlab experts during blasting operations at the quarry for post-project monitoring (as required by the Environmental Impact Assessment).

Audit

Visit to the factory of freeze-dried products May 2023

Audit of the enterprise to identify sources of air pollutant emissions

Аудит

Visit for measurements to one of the ports of Ukraine May 2023

Air emissions from mobile sources

Why we?

Expertise

A staff of expert ecologists with vast practical experience

Speed

(execution of work within the set time) - Mobile and high-precision equipment for on-site measurements

Mobility

modern and portable equipment for field measurements

Accreditation

the equipment is certified and authorized

Customers speak

"Ecosmartlab specialists are working together have proven themselves as an effective team of professionals who are capable qualitatively solve issues in the field of environmental protection environment in compliance with the established deadlines for the completion of work. "
Head of the Izmail Branch of State Enterprise "AMPU"
The company Ecosmartlab during the execution of the contract 3 have recommended themselves as a reliable partner capable of responding quickly to needs client and provide quality services. A distinctive feature of Ecosmartlab company specialists is their high professionalism, organization of company employees and honesty.
FARMING (MAXIM)
"The Ecosmartlab company carried out work on the development and coordination of an individual program and plan at the Ministry of Natural Resources after the project monitoring of the planned activity of asphalt concrete production on the territory of the enterprise in accordance with the Conclusion on the assessment of the impact on the environment. The work was performed at the appropriate level within clearly defined deadlines and in accordance with the requirements of current environmental protection legislation